How much does a quantity surveyor cost?

A QS may prepare a cost plan or act as the lender's monitoring surveyor. Estimate a typical fee below.

Quantity surveyor fee estimatorLive estimate

Cost plan or an initial monitoring-surveyor report. Ongoing drawdown monitoring is charged per visit.

Estimated cost
£1,500
range £500£2,500

Indicative estimate — confirm with quotes.

Where a QS fits a deal

  1. 1
    Cost planning

    A QS can independently cost a project — useful on larger or unusual schemes where benchmark rates aren't enough.

  2. 2
    Monitoring surveyor

    On refurbishment finance, the lender's monitoring surveyor signs off each phase before a drawdown is released.

  3. 3
    You usually pay

    The monitoring surveyor acts for the lender but their fees are normally a borrower cost — budget them in.

The monitoring surveyor is the person your drawdowns depend on, so their fee is a predictable soft cost worth budgeting — and a clean, phased, itemised schedule of works is what makes their sign-offs (and your fund releases) quick.

Quantity surveyor fees (indicative)

ServiceBasisIndicative cost
Cost plan / estimatefixed£500 – £1,500
Initial monitoring reportfixed£500 – £1,000
Drawdown site visitsper visit£300 – £700
Full project QS% of build1% – 3%

On bridging/development finance, the lender appoints a monitoring surveyor whose fees you typically pay.

Frequently asked questions

How much does a quantity surveyor cost?+

A cost plan typically costs £500–£1,500; an initial monitoring-surveyor report £500–£1,000, with drawdown site visits £300–£700 each. A full project QS service is often 1–3% of build cost.

Do I need a QS for a bridging loan?+

The lender usually appoints a monitoring surveyor (often a QS) who signs off each phase before releasing funds — and you typically pay their fees. A well-itemised schedule of works makes those sign-offs faster.

Related tools & guides

Want to know how these figures are calculated? See our cost methodology.

Indicative estimates — not a quotation

Cost figures shown are indicative estimates, not quotations. You are responsible for verifying all costs (obtain contractor quotes) and any figures submitted to a lender. ScopeWise is a documentation tool, not financial, tax, structural or planning advice. HMO compliance prompts are guidance only — confirm requirements with your local council, as standards and licensing vary by authority.